As distributed control systems (DCS) age for powder and bulk solids processors, there can be increasing risks to production. An old or obsolete DCS system may no longer be supported by the original supplier, spare parts may no longer be readily available, and system performance issues may begin to appear. With some DCS systems now decades old, system users often know they need to upgrade but find the task daunting, given the cost and potential for disruption of operations while the new system is brought online.

Even if powder and bulk solids processors have installed newer equipment alongside legacy components, there can be considerable challenges maintaining disparate legacy systems, associated spare parts, and the different skill sets required to support multiple control system platforms. This can lead to “islands of automation” that diminish the effectiveness of a user to integrate, control, and optimize the entire process from beginning to end. It may be that the system user has simply outgrown the existing control system due to increased production demands and/or newly added processes.

To cost-effectively handle such issues, we discuss the advantages of addressing gaps, potential risks and islands of automation on a staged basis with Dwight Wood, vice president of NovaTech’s processing div., a PA-based automation provider whose D/3 DCS system solution was introduced 38 years ago as the first hybrid batch and continuous control architecture. This approach minimizes costly disruptions to operations and provides greater flexibility as equipment and data needs evolve over time.

Q: How common is it for powder and bulk solids processors to face issues with upgrading old DCS systems?

A: Most powder and bulk solids processors are looking to maximize their automation investments and run them as long as they can before upgrading or replacing. A number of processors have come to us with I/O, controllers, and even servers that are 30 to 40 years old.

When they ultimately decide to move forward on an upgrade, however, they often find that their DCS supplier has implemented a new generation of technology that lacks a cost and mission effective migration path to update the existing system. They often find themselves in a situation requiring a rewrite of applications programming or a complete “rip and replace.”

Q: What options are available if the cost or disruption of completely replacing an old DCS system is simply not affordable or feasible?

A: Fortunately, ripping and replacing a dead-ended DCS system is not required. Addressing the vulnerabilities that are present with a legacy DCS does not always require a disruptive all-at-once approach. For a plant of any scale running at or near capacity, taking down processing lines for any amount of time can be extremely expensive in terms of lost production and business impact.

Instead, many engineering, operations, and procurement teams are opting for a multi-stage implementation over a total system overhaul by phasing in newer DCS servers, controllers, and applications. This approach is more affordable and less disruptive, while still allowing gaps, points of pain and cybersecurity risks to be addressed immediately.

Q: How does the process of upgrading an old DCS system typically begin?

A: For powder and bulk solids processors, the process typically begins with a consultation and “deep dive” into the current system and application. The process begins by diagnostically identifying the pain points, gaps, operating challenges, and any other potential risks in the current process and control system implementation. This supports a more targeted approach that focuses on areas of improvement that can bring the greatest impact in terms of operations and addressing risk exposure.

Q: What are some considerations to keep in mind when using a multi-stage migration approach?

A: A multi-stage migration approach can often begin by integrating new DCS components with new and existing I/O devices. As I/O is one of the most significant investments in an automation upgrade, I/O drops can be replaced in a phased manner over time allowing for spare parts capture from decommissioned drops, phased implementation aligned with plant outage limitations, and staggered financial investment.

Another consideration is the need to integrate the DCS system with the existing enterprise systems. Powder and bulk solids processors want more than an effective implementation of the level 2 automation system. They often want improved data capture and the conversion of that data into useful knowledge presented in desktop KPI dashboards that can be utilized at the manufacturing execution level and/or the enterprise ERP level.

Q: In terms of the DCS system user interface, what approaches can be used to simplify the upgrade?

A: A DCS system is a hub of a processor’s operations monitoring key variables such as flow, applied temperatures, pressure, level, and material conveying/handling. The operator user interface brings all the data that is collected from production equipment and the controllers process and present it in a highly “human factored” manner for an operator, generating trends, alarms, etc.  

The NovaTech D/3 interface, for example, displays real time process information in a complete customer-oriented graphical human-machine interface (HMI). Custom graphics, built using dynamic objects from an extensive library, make it easy for the operator to control the process, enter information, and interact with sequence programs.

Standard operating procedures, maintenance records, and other information are also available in desktop application formats. The information can be viewed using common Web browsers to display data from multiple plant sites from anywhere in the world.

Q: What other considerations are important for DCS replacement and implementing a cost-effective migration path into the future?

A: A DCS replacement is a significant investment that is designed as a long-term contribution to operations. Two key considerations are the system’s migration path and the overall DCS lifecycle cost.

Whether the search for a control system replacement was caused by system limitations or an existing system being “dead ended” by the supplier, process manufacturers want to avoid this situation happening in the future. When considering a project or supplier, the new system should be scalable, flexible, and able to upgrade to future releases on an ongoing basis to leverage system updates and improvements.

The D/3 system, for example, was introduced in the early 1980s. As a testament to its longevity and flexibility, the system can still be upgraded with applications written to run on the current version. Hardware has to be upgraded, of course, but a complete “rip and replace” is not required.

The total lifecycle cost of ownership also needs to be factored in any DCS or control system migration or replacement project. The financial investment in replacing a control system encompasses more than the initial outlay for new hardware, software, and engineering services. In addition, process manufacturers need to consider recurring maintenance, service support, and upgrade costs that they will incur over what can easily be a 20-year or more lifespan. Companies work with powder and bulk solids processors upfront to define this cost and provide a system life cycle plan to effectively manage and support the overall investment.

A DCS sits on top of an inherently dynamic processing environment made more so as new equipment is added, production lines are expanded, and as issues like obsolescence and cybersecurity present new challenges over time. That is easier to navigate if there is a well-defined system life cycle plan and migration path forward that includes a carefully thought-out execution plan for success.

For more information on DCS platforms, visit https://ift.tt/2QpSK21 or call 844-668-2832.

For more articles, news, and equipment reviews, visit our Instrumentation & Control Equipment Zone

Click here for Instrumentation & Control Equipment Manufacturers

Let's block ads! (Why?)



"powder" - Google News
January 04, 2020 at 03:57AM
https://ift.tt/37v9xGz

A Multi-Stage Approach to Upgrading Aging DCS Systems - Powder Bulk Solids
"powder" - Google News
https://ift.tt/340CkR7
Shoes Man Tutorial
Pos News Update
Meme Update
Korean Entertainment News
Japan News Update
Share:

0 Comments:

Post a Comment